Battery Energy Storage Solutions
overview
Battery Energy Storage System’s technology helps improve energy flow at every stage of the energy transmission chain. It can reduce generation costs, managing and flattening the load profile and consequently avoid/postpone grid upgrades and/or the need for additional peaker stations.
Furthermore, energy from renewable sources can be integrated with BESS to optimize the plant’s generation profile to either obtain a flat profile or store excess production to release later when required. Moreover, BESS makes the grid smarter and capable of using electrical power at the grid level when it is most needed.
Play Video
ACBOX | All-in-one solutions
ACBOX are all-in-one solutions based on a proprietary design that combines batteries, 4-quadrant AC/DC power conversion, efficient thermal management via an embedded water-cooling system, and state-of-the-art safety features; units are delivered in rugged high-cube containers to ensure maximum robustness and compatibility with the harshest environments, and are complemented by an external MV/LV transformer and MV switchgear, also configured and supplied by Nidec, while seamless integration with Nidec Conversion’s Power and Energy Management Systems ensures maximum flexibility to meet customer application demands and grid code requirements.
Power Unit (PU)
Nidec Power Unit is a complete plug & play skid solution that includes the MV switchgear, the power transformer and the Power Conversion Systems.
Ready For Next Generation Grids Grid-connected grid forming operation with fault ri- de-through and synthetic inertia capabilities make Nidec Power Conversion Systems ready to support grids in the face of ever increasing penetration of non-programmable power generation.
Hassle-Free Projects
Nidec Conversion supports hassle-free projects through a turnkey or electrical-partner approach tailored to customer needs, delivering fully in-house manufactured systems based on proprietary Power Conversion Systems (and an integrated Power Management System), while maintaining a collaborative partnership model; the process is streamlined into three steps: Configure, Assemble & Test, and Install & Commission.